09/02/2009
Great success at MADE 2009
Another success by CEMI at MADE 2009, the fair that took place in Milan, Rho, Italy , from the 04 to the 07 of February: MADE has become one of the most important appointments for companies specialized in design and construction.
CEMI has taken the occasion to present its last creation: Steela Salus overflow System.
For the very first time in the world of the Therapeutic Swimming-pools and thanks to Steela Salus Overflow System, CEMI is introducing the “design” that only an overflow system can guarantee.
Moreover CEMI presented the new swimming pools line: SUITEGARDEN by CEMI, pre fabricated swimming pools built up with EASY AND FAST PULS method.
This innovative method of construction plans that, after the hot-dip galvanization, the panels will be covered with a special coat of polyester paint. Thanks to this particular treatment SUITEGARDEN swimming pools are guaranteed as a stainless steel swimming pool, but they are cheaper.